819011713 - Rev. A - November 29, 2018
INSTALLATION
STEP 7
Install three (3) appropriately-rated mounting
screws, based on wall materials and weight-bearing
requirements noted on page 4, through HCWF-P top
brace (Fig. 8). Drill pilot holes as needed.
Fig. 8
STEP 8
Span strut channel across two (2) ceiling trusses,
above drop ceiling (Fig. 9).
Fig. 9
STRUT CHANNEL
STEP 9
Screw all-thread support rod into nutsert attached
at top of freezer compartment, behind evaporator
housing (Fig. 10).
Fig. 10
STEP 10
Secure other end of all-thread rod to strut channel,
using supplied hardware (Fig. 11).
Fig. 11