EasyManua.ls Logo

Freedom 30 - Commissioning Checklist

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COMMISSIONING CHECKLIST
4.2
PRELIMINARY
___
Read owner's manuals
___
Check propeller, nut, cotter pin and zinc.
___
Install transducers
___
Close seacocks
___
Check all hose clamps and tighten as required
___
Touch up bottom paint
___
Install wheel
___
Dewinterize engine and heads, if so supplied
_
_
Check engine oil, transmission and coolant levels
___
Check battery charge with battery test switch on electrical
panel
___
Remove mast hole covers
___
Pre-rig masts - run halyards; install headstay, lazy jacks,
topping lift and mast collar
___
Cover the cushions or remove them from boat in order to
protect them during commissioning.
___
Mark prop shaft
LOOSE GEAR
___
Fenders w/lines ready
___
Dock lines ready
___
Winch handles
___
Ignition keys
___
Bilge pump handle
___
Install portlight screens
___
Sink strainers
___
Mast Wedges ready on mast
___
Mast retaining bolt ready
___
Stow remaining loose gear