EasyManua.ls Logo

Freedom 30 - Engine Start

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COMMISSIONING CHECKLIST
4.2-1
LAUNCH
__
._ Check for leaks
___
Check operation of seacocks
___
Check stuffing box
ENGINE START
___
Read engine owner's manual
___
After launching, check alignment and hook up couplings
___
Start engine
___
Check exhaust for cooling water flow
___
Check oil pressure, water temperature, charging guages - stop
engine immediately if not in proper ranges per engine manual.
___
Check transmission operation
___
Check stuffing box
STEP MASTS
___
Pre rig masts w/halyards, lazy jacks, collar, alignment bolt, etc
___
Install electronics wiring in masts
___
Remove headliner trim pieces around mast opening in deck.
___
Hoist spar and lower carefully into boat
___
Install wedges while aligning masts
___
Install deck collars - place on mast prior to stepping mast
« ? Install overhead trim
-lOr
___
Make electronical connections at mast base
RIGGING
___
Install boom and attach lazy jacks
___
Lead all sheets and halyards to stoppers on deck house
___
Rig reefs and vangs
___
Bend on sails
___
Install battens