OPERATION
© frifri Aro SA 5-17 OM - 1.0 - 25.10.2004
5. Tilt submerged heater upwards as necessary. Flush out frying vessel and pump the frying oil into an external oil catch-
ment container.
6. Press membrane switch until the flushing procedure has been completed and the whole quantity of frying oil has been
pumped over to the external oil catchment container.
As long as the frying oil pump is in operation the symbol “Frying oil pump running” is shown on the display.
7. Tilt down the submerged heater as necessary.
CAUTION
• Do not allow frying oil pump to run dry.
• f the frying oil pump inadvertently runs dry it will be switched off automatically by the controller after
3 minutes to avoid damage.
Membrane
switch
Display / setting