4.5.13 Assembling the FGR duct 36
4.5.14 Assembling the upper insulation base frame 36
4.5.15 Installing the insulating side panels 39
Turbomat TM 320
40
Turbomat TM 400/500
46
4.5.16 Installing the underpressure controller 51
4.5.17 Installing the combustion chamber overpressure monitor and temperature sensor 52
4.5.18 Installing the air flap actuators 53
4.5.19 Assembling different cover plates 54
4.5.20 Installing the heat exchanger ash removal unit 55
4.5.21 Fitting the combustion chamber ash removal unit (optional) 59
4.5.22 Fitting the heat-exchanger drive 61
4.5.23 Fitting the FGR blower fan 62
4.5.24 Installing the induced draught fan 65
4.5.25 Installing the combustion air fan 67
4.5.26 Fitting the temperature sensor under the moving grate 68
4.5.27 Assembling the automatic ignition 68
4.5.28 Assembling the insulated doors and covers 69
4.5.29 Fitting the pivoting mechanism for the oil burner (optional) 71
4.6 Power connection and wiring 74
4.6.1 Potential equalisation 74
4.6.2 Laying of cables 74
4.7 Connecting the hydraulic safety devices 76
4.8 Connecting up the slide-on duct cooling 78
4.9 Final installation steps 79
4.9.1 Setting and checking the seal on the doors 79
Checking the setting
79
Checking the seal
79
4.9.2 Adjusting the doors 80
5 Commissioning 81
5.1 Before commissioning / configuring the boiler 81
5.2 Initial startup 82
5.2.1 Permitted fuels 82
Wood chips
82
Wood pellets
82
Wood shavings
82
Miscanthus
83
Changing the fuel
83
5.2.2 Non-permitted fuels 83
5.3 Heating up for the first time 84
5.3.1 Screed drying 85
6 Decommissioning 86
6.1 Out of service for long periods 86
6.2 Disassembly 86
6.3 Disposal 86
7 Appendix 87
7.1 Addresses 87
7.1.1 Address of manufacturer 87
7.1.2 Address of the installer 87
Table of contents
Installation Instructions Turbomat TM 320-500 | M0690817_en 3