EasyManua.ls Logo

Fronius FK 4000 - Commissioning the Cooling Unit

Fronius FK 4000
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Commissioning
the cooling unit
NOTE!
The coolant level and cleanliness of the coolant must always be checked before
commissioning the cooling unit.
Connect the power source to the mains
Turn the power source mains switch to the "I" position
- The coolant pump starts up
Check the coolant flow until you can see a steady return flow of coolant through the fill
nozzle
NOTE!
During welding, check at regular intervals that the coolant is flowing properly.
You should be able to see a steady return flow of coolant through the fill nozzle.
1
2
3

Table of Contents

Other manuals for Fronius FK 4000

Related product manuals