Location of the primary meter in the consumption branch. *Terminating resistor R 120 Ohm
Location of the primary meter at the feed-in point. *Terminating resistor R 120 Ohm
The following must be observed in a multi-meter system:
- Connect the primary meter and the battery to different channels (recommended).
- The remaining Modbus participants must be distributed equally.
- Only assign each Modbus address once.
- Terminating resistors must be positioned individually for each channel.
Menu structure A graphic view of the menu structure can be found in the User Information that is sup-
plied as standard.
Setting the
address of the
Fronius Smart
Meter
Symbol Name Event Function
Prog
1 x
Increases the set value
Page
1 x
Moves the cursor
Enter
1 x
Confirms the entry
20