6.2.1.3 Indicators on the control panel
Symbol Indicator Status Description
Power-on
indicator
Power-on
indicator
green on Server is switched on and running.
orange on
Server is switched off, but mains
voltage is present (standby mode).
I After connecting the server
to the mains, it will take
about 60 seconds until the
server will switch into
standby mode.
yellow /
orange
flashing
iRMC booting
I After connecting the server
to the mains (power cord
plugged in / after mains
failure) the iRMC will boot.
The system cannot be
switched on, until the iRMC
boot sequence is complete.
During this time, the power-
on indicator will flash
yellow / orange.
yellow on
Power on delay
I After shutting down, the
server cannot be switched
on again right away. If the
On / Off button is pressed
right after shutting down the
server, the power-on
indicator will light up yellow
until the delay period ends
and the server will boot.
HDD / SSD
activity
indicator
green
flashing
Data access in progress

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY TX1330 M1 and is the answer not in the manual?

Fujitsu PRIMERGY TX1330 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY TX1330 M1
CategoryServer
LanguageEnglish

Related product manuals