EasyManua.ls Logo

Fujitsu SPARC Enterprise M9000 - Page 316

Fujitsu SPARC Enterprise M9000
546 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13-24 SPARC Enterprise M8000/M9000 Servers Service Manual June 2010
14. Start (turn on power) all domains together. Take either of the following two
actions:
Press and hold down (for less than four seconds) the POWER switch on the
operator panel.
From a console that is connected to XSCF, execute the poweron -a command
of XSCF.
The power to all the domains is turned on, and then the power-on self test (POST)
is executed. When ok prompt displayed on the console of relevant domain, POST
is completed.
For details of the power-on operation, see Section 4.4.2, “Powering the Server On”
on page 4-19, and the SPARC Enterprise M3000/M4000/M5000/M8000/M9000
Servers XSCF Users Guide.
15. Restore the original mode switch setting on the operator panel.
Note – When the maintenance work is completed, be sure to confirm the mode
switch setting and return the switch to Locked.
16. Close the door on the server, and lock it.

Table of Contents

Related product manuals