© Fulton Group N.A., Inc. 2022
INSTALLATION EDR-SOLA-IOM-2022-0216 SECTION 2
2-26
OUT TO
EXHAUST
TERMINATION
STAINLESS STEEL
EXHAUST PIPE
STAINLESS STEEL
ENDURA ADAPTOR
(CONSULT YOUR
VENTING SUPPLIER)
UPDATED ELBOW LOCATION. M.E.B. 8/18/14 N/A N/A
8/21/14
8/21/14
8/18/14
REVISION HISTORY
REVISION DESCRIPTION B.O.M. ELEC. ENG MECH. ENG CHECKED APPROVED
45° REDUCING TEE
(SEE NOTE 7)
SWEEPING 90° ELBOW
(SEE NOTE 8)
UP TO TERMINATION
COMMON EXHAUST HEADER
(SEE NOTES 4,5,6)
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
THIS IS A TYPICAL ARRANGEMENT FOR
PURPOSES ONLY. ACTUAL INSTALLATION
ALTERNATE OR ADDITIONAL COMPONEN
SHOWN FOR CLARITY.
THIS DRAWING IS NOT FOR CONSTRUCT
REFER TO THE INSTALLATION AND OPER
INFORMATION REGARDING CLEARANCES
REQUIREM
ENTS.
THE COMMON EXHAUST HEADER SHOUL
A SLIGHT NEGATIVE PRESSURE WITHIN
OF THE BOILER. A POSITIVE PRESSURE
WILL REQUIRE ACCESSORIES TO GUARA
CANNOT TRAVEL BACKWARD THROUGH
A CONSTANT DIAMETER COMMON HEAD
DO NOT USE THE STATIC REGAIN METH
A MINIMUM 1/4" RISE PER FOOT RUN IS
A 45° REDUCING
TEE OR ELBOW IN THE
IS RECOMMENDED. STRAIGHT OR 90° TE
USED.
DO NOT USE BOOT TEES OR BULL HEAD
ENDURA BOILERS CANNOT BE COMMON VE
FULTON ENDURA
HYDRONIC CONDENSING BOILER
ECCENTRIC INCREASER
PVC
EXHAUST PIPE
PVC COUPLING
CPVC
STARTER PIECE
OUT TO
EXHAUST
TERMINATION
STAINLESS STEEL
ENDURA TO
CPVC APPLIANCE
ADAPTER
(SEE TABLE 8)
(SEE TABLE 8)
FIGURE 19 ENDURA EXHAUST VENTING
FIGURE 20 ENDURA COMMON EXHAUST VENTING; TYPICAL INSTALLATION GUIDELINES
Note: All installations must
be in compliance with local
and national codes. Typical
installation diagrams in this
manual are for reference
purposes only.