EasyManua.ls Logo

FULTON Endura+ Series - User Manual

FULTON Endura+ Series
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION AND
OPERATION MANUAL
Endura+ (EDR+)
Condensing Hydronic Boilers
2,500,000 - 6,000,000 BTU/HR
Serial/ National
Board Number
Model
Fulton Order
Owner
Site Name
Date
EDRP-IOM-2019-0212
DRAWING NUMBER
REV
G-36-100024
-
ENDURA+ CUSTOM ISOMETRIC VIEW
DESCRIPTION:
DRAWN BY:
B. PALMER
CHECKED BY:
B.O.M. REVIEW
MECH. ENG:
ELEC. ENG:
APPROVED BY:
K.D.B.
JOB NUMBER:
PROJECT NAME:
PROJECT MANAGER:
This design and drawings
are proprietary and are the
exclusive property of
Fulton Group N.A., Inc.
The corporation does not
permit their use except
with prior written consent.
The items shown in this
drawing ma
y be covered by
one or more patents of
Fulton Group N.A., Inc.
1 OF 1
THIRD ANGLE PROJECTION
Fulton Group N.A., Inc
972 Centerville Road
Pulaski, New York USA 13142
4/11/2016
4/19/2016
UNLESS OTHERWISE NOTED
DIMENSIONS ARE IN INCHES
R
SHEET 1 OF 1
(1) PLACE DEC. 0.03
(2) PLACE DEC.
0.015
(3) PLACE DEC.
0.005
ANGLE
0.5 DEG
SURFACE FINISH
250 MICRO-INCHES
TOLERANCES
FRACTION &
WHOLE VALUE
1/8
-
INITIAL RELE ASE
- - - - - - - - - - - - - - - - - - - -
REVISION HIS TORY
REV REVISION DESC RIPTION B.O.M. ELEC. ENG MECH. ENG CHECK ED APPRO VED

Table of Contents

Questions and Answers

Summary

Introduction

Overview

Provides an overview of the manual's purpose and the boiler's pre-shipment inspections.

Warnings and Cautions

Highlights critical safety information to prevent injury, death, or equipment damage.

Disclaimers and Local Codes

Outlines installation compliance with national, state, and local codes and standards.

Installation

Product Overview

Details the Endura+ boiler's features, certifications, and components included with the unit.

Placement and Rigging

Provides essential guidelines for the proper placement and rigging of the boiler to ensure safe installation.

Clearances and Serviceability

Details required clearances for safe operation, maintenance, and serviceability.

Install Water Piping

Outlines proper procedures and requirements for installing water piping systems.

Meet Water Chemistry Requirements

Specifies crucial water chemistry requirements for boiler longevity and warranty.

Gas Supply Piping

Covers requirements for supplying natural gas to the boiler for efficient combustion.

Venting Requirements

Outlines essential requirements for the boiler's venting system, including pressure drop and draft.

Combustion Air Intake

Details requirements for supplying combustion air to the boiler room and directly to the boiler.

Flue Gas Exhaust Venting

Requirements for appropriate venting materials and installation for flue gas exhaust.

Electrical Connections and Devices

Details on electrical connections, voltage limits, and wiring practices for the boiler.

Integrated Lead;Lag Sequencing Wiring

Details on integrated lead/lag sequencing capabilities for multiple boilers.

Auxiliary Safety Interlock for External Devices

Connecting external devices for safety interlocks, like fan operation or motorized louvers.

Emergency Stop (E-STOP)

Connecting an emergency shutdown switch or remote control panel.

Operation

Perform Pre-Start-Up Inspection

Checklist of essential pre-start-up inspections before operating the boiler.

Fill and Purge the System

Procedure for completely filling and purging the heating system with water.

Commission The Boiler

Steps and requirements for commissioning the boiler, including verification and manual review.

Siemens LMV3 Control

Introduction to the Siemens LMV3 burner management system and its interface.

Steps to Enter Parameters

Step-by-step guide to accessing and entering boiler parameters using the LMV3 control.

Adjusting Fuel;Air Curve

Procedure for adjusting fuel/air curve points using a calibrated flue gas analyzer.

Manual Control (Manual Request for Output)

How to manually control boiler output and return to automatic mode.

Parameter Backup

Procedure for backing up boiler control parameters for safety and reference.

Parameter Restore

Procedure for restoring boiler control parameters from a backup.

Using the Endura+ PURE Control Interface

Overview of the PURE Control touchscreen interface for commissioning and operation.

Boiler Control

Accesses individual boiler and ancillary functions, including boiler status.

Safety Device Status

Indicates the status of safety devices, showing open or closed circuits.

Operator Control

Allows control of Start/Stop Deviations, Anti-Cycle Timer, and Manual Burner Control.

Lead;Lag

Setup for integrated multiple boiler sequencing (Lead/Lag) over Ethernet/IP network.

Setpoint

Maintains supply water temperature based on setpoint from various sources.

Commissioning Mode

Places the boiler in commissioning mode for adjusting combustion parameters.

Perform Test of Limit Controls

Tests high limit control by setting a lower temperature value.

Maintenance

General

Overview of maintenance practices for safety, efficiency, and reliability of Endura+ boilers.

Daily Maintenance and Inspection Schedule

Daily checks including temperature, air flow, and boiler area cleanliness.

Weekly Maintenance and Inspection Schedule

Weekly checks including main flame observation and fuel/air adjustment.

Monthly Maintenance and Inspection Schedule

Monthly checks including limit controls, flue gas temperature, and pressure switches.

Annual Maintenance and Inspection Schedule

Tasks performed annually by a factory trained technician for boiler upkeep.

Removing, Inspecting and Cleaning Burner

Step-by-step guide for removing, inspecting, and cleaning the boiler's burner assembly.

Inspecting the Pilot Ignition Assembly

Annual inspection procedure for the pilot ignition assembly.

After All Repairs and Maintenance

Final checks and documentation required after completing maintenance tasks.

Troubleshooting

Guides for diagnosing and resolving common boiler problems and their causes.

FULTON Endura+ Series Specifications

General IconGeneral
Boiler TypeCondensing
Fuel TypeNatural Gas, Propane
Heat Exchanger MaterialStainless Steel
EfficiencyUp to 99%
InstallationIndoor
ConfigurationVertical

Related product manuals