EasyManua.ls Logo

FULTON Endura - General Boiler Operation

FULTON Endura
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Fulton Group N.A., Inc. 2022
3-34
OPERATION EDR-SOLA-IOM-2022-0216 SECTION 3
! WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Non-Fulton product information is for
reference purposes only. No Fulton
document may substitute for full
review of documentation available
from the component manufacturer.
General Operation of the Boiler
Excessive cycling will reduce the useful life of any piece of mechanical
equipment. Endura boilers should be operated and controlled so the boiler
cycles less than 12,000 times per year. Endura boilers should be operated and
controlled so that the temperature dierential across the boiler does not exceed
100°F (38°C).

Related product manuals