EasyManua.ls Logo

Furuno GP-1650W - 3. TRACK; 3.4 Track Plotting Method, Interval

Furuno GP-1650W
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. INCORPORATION OF DGPS BEACON RECEIVER KIT (for GP-1650W)
18
Beacon receiver
GR-7000A
J1
J3
Cable assy.
S.FL2-2LP0.7-D-WHT (121)
Cable assy.
S.FL2-2LP0.7-D-WHT (175)
Notch
Beacon receiver
8. Connect cable assy. S.FL2-2LP0.7-D-WHT (121) (supplied) to J3 of the GR-7000A.
9. Close the lid of the GR-7000A.
10. Connect connector assy. PH6P-W-L240 to J2 of GR-7000A (Refer to the next page).
11. Fasten the GR-7000A (Beacon receiver) to the heat sink with four M3X10 screws
(supplied) as shown in the figure below.
Connect to
J2 on GN-8091.
Connect to
J106 on
MAIN Board.
GN-8091
Heat sink
S.FL2-2LPO.7-D-WHT (121)
Cover of GR-7000A
Cable Assy.
PH6P-W-L240
Beacon Receiver Board
GR-7000A
J2
Pan-head Screw B
M3X10, 4 pcs.
Notch
Connect to J107
on MAIN Board
Connect to
J8 on ANLG
Board.
Installation of DGPS beacon receiver

Other manuals for Furuno GP-1650W

Related product manuals