EasyManua.ls Logo

GE 225 - Unpacking

GE 225
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
g
GE
OPM_SGS_ISG_M22_M30_0US_V011.doc 16/38 Installation Guide
SG Series
225 & 300 kVA
3.6 UNPACKING
The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden
crates (if requested).
Move the cabinets as close as possible to the final location before removing from the pallet.
If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the
heavy weight of the equipment.
Take care not to damage the UPS when moving by forklift.
For parallel systems, the delivery also includes the bus control
cables for inter-connecting the UPS modules.
Packing material recycling
GE Industrial Systems, in compliance with environment protection, uses
only environmentally friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Related product manuals