1. With
outside
poles
open,
loosen
adjustment
plate
(10) of
center
pole
on
crossbar
(9
) by
freein
g-
.;
bolt
locking
tab
and loosening
bolts
(11).
_
2.
.
If
center-pole
wipe
or
overlap
is
to
be
increased,
move the
adjustment
plate
to
the left;
if
it
is
to
be
decreased,
move
it
to
the
ri
ght.
3.
After
proper
adjus
tment
is
made,
ti
ghten
adjus
tment
plate
bolts
until
plate
is
snu
g.
Then
tap
adjustment
plate
in
such
a way as to
bring
lower
edge of
slot
in
plate
to
bear
ag
ainst
bolt.
Tighten
bolt
until
lockwasher
is
fully c
ompres
sed.
Then
form
locking
tabs
over
bolt
heads
so
that
bolts
are
securely
held
in
place.
NOTE:
If
the
above adjustment
has
been
made,
it
is
necessary
to
-
recheck
the
outer-pole
wipe.
If
this
is
outside
the
prescribed
limits,
correct
as
described
in
POLE
UNIT
ASSEMBLY.
4.
If
proper
wipe cannot be obtained within
the
range
of
the
adjus
tment
described
above,
it
will
be
necessary
to
obtain
further
adjustment
by
_
means
of
the
vertical
-
shims
(14) provided
for
the
purpose.
In
order
to
accomplish
this,
proceed
as
follows: ·
a.
Separate
the front -
frame
from
the back
frame
(see
SEPARATION OF FRONT AND REAR
FRAMES).
·
b.
Loosen
-
screw
(13) and
remove
bolt
(15).
c.
Remove
vertical
shims
(14) to
decrease
.
wipe; add
to
increase
.
d.
Replace
bolt
(i5)
and·
ti
g
hten
screw
(13).
e.
Re
as
semble
front
and
back
frame
.
Adiusting
Center-pole Open
Contact
G_ap
(Fig.
17}
Improper
open
contact
gap
of
the
center
pole
may
be
ad
j
usted
by -the following procedure.
1.
Loosen
screw
(13) and
bolt
(15).
2.
If
gap is
to
be
increased,
horizontal
shims
-
(14) should
be
remove
·d, .
If
it
is
to
be
decreased
,
they
should
be
added. Shims
may
be
removed by
sliding
them
to
the
front
of the
breaker.
They
are
·
slotted
for
eas
y r_emoval. (Effect
of
this
ad-
j1.:1stmen~
on contact wipe and
overlap
is
negligible.)
3.
Ti
ghten
hardware.
Contact
Replacement
·
-
Stationary
Contacts
(Fi
g.
17
)
- .
1: Remove
arc
quencher
(s
ee
ARC QUENCHER).
2. Remove screw
(5)
from
braid.
3.
Drift
out
pin
(4) and
remove
co
ntacts.
4.
Reassemble
in
reverse
ord
er wi
th
new
Low Voltage
Power
Circuit
Breakers
GEK
-7
303
contacts.
5. Check contact
overlap
anc;l
wipe, and
re-
adjust
if
necessary
(see
above).
Movable
Contacts
(Fi
g. 17)
1.
Remove
arc
quencher
(see
ARC
_QUEN-
CHER).
2.
Remove
tru-ar
c r e
tainers
on
right
side
of
pins
(7) and (16).
3.
Drift
pins
(7) and (16)
to
the.left
far
enough
to
free
movable contacts.
4.
Reassemble
in
reverse
order
with new
contacts.
5.
Check contact
overlap
and wipe and
re
-
adjust
if
necessary
(see
above}.
,---
--
---
9
,-----
--a
----
- 7
,--
---
- 6
r---
- - - 5
,----
4
Fig.
18
(0133C9020) Auxiliary.
switc~
linkag-e
·
-standard
breaker
-
AUXILIARY SWITCH
AK
BREAKERS
(Fig,
18)
The
auxiliary
switch
is
used
to
make and
break
various
control
circuits
as
the
circuit
breaker
is
opened and
closed
, The
auxiliary
switch
is
mounted
on
the
left
side
of
thefrontframe
. As the
crossbar
(4) moves, with the
contacts,
to
the open
or
closed
position
it
operates
a
triangular
link
(6)
through
an
operating
rod
· (5).
The
triangular
link
rotates
the operating
shaft
(8) of the
auxiliary
switch, which,
through
cams
located
on
this
shaft, opens and closes
the
auxiliary
switch
contacts.
The_ top terminals
of
the
switch
are
"a"
-
contacts
(open
when
the
breaker
is
open) and the bottom
terminals
are
"b"
contacts (closed when
U1e
bro
ak
o
;r
is open).
Repl~mmenl (Fig. 18)
1. Disconnect
all
leads
to
auxiliary switch.
21

Table of Contents

Other manuals for GE AK-1-15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AK-1-15 and is the answer not in the manual?

GE AK-1-15 Specifications

General IconGeneral
BrandGE
ModelAK-1-15
CategoryCircuit breakers
LanguageEnglish

Related product manuals