5.
~eplace
i°:
reverse
order.
. 6. Check positive
trip
to
obtain approx.
1/32"
,-,vertravel
after
armature
is
moved sufficiently
to
trip
the
breaker.
!Power Supply (F~g. 34) .
1. Remove
trip
solenoid wires from the term-
inal
board
on
Power
Supply. · ·
I
2.
Remove
three
boltsholdingmountingbrack-
et
to
mech~sm
frame.
3,
Remove w~ring
cleats
4. Remove
disconnect
plug by
alternately
loosening two
retaining
screws.
5. Remove·
Power
Supply Unit with control
wiring.
6.
Reassemble
in
reverse
order.
SENSOR
Coils
(AK-3-50) Only_ (Fig. 32)
1.
Disconnect
J_>lug
between the
Power
Supply
Unit and
the
sensor
coils
and rempve tapped
screw
holding
female
plug
to
breaker
mechanism
frame
. 2.
Separate
front
frame
from
back
frame
as
described
under
SEPARATION OF FRONT & REAR
FRAMES.
:.
Fit;.
38.
(7612-6-2)
Grow1d
Sensor Coil
(Remotely Located)
1.
Terminal
2.
External
Ground
Sensor
Con
3. White
Polarity
Dot
Low Voltage
Power
Circuit
Breakers
GEK-7303
Fig.
37 (0133C9018}
Power
Sensor
Cabling
Diagram ·
Fig.
39 (8039962) Power
Sensor
Kit

Table of Contents

Other manuals for GE AK-1-15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AK-1-15 and is the answer not in the manual?

GE AK-1-15 Specifications

General IconGeneral
BrandGE
ModelAK-1-15
CategoryCircuit breakers
LanguageEnglish

Related product manuals