9-2 C60 Breaker Protection System GE Multilin
9.1 MODULES 9 MAINTENANCE
9
To properly remove a module, the ejector/inserter clips, located at the top and bottom of each module, must be pulled
simultaneously. Before performing this action, control power must be removed from the relay. Record the original loca-
tion of the module to ensure that the same or replacement module is inserted into the correct slot. While modules with cur-
rent input provide automatic shorting of external CT circuits, for CT/VT modules it is recommended to short/isolate external
circuits accordingly for maximum safety.
To properly insert a module, ensure that the correct module type is inserted into the correct slot position. The ejector/
inserter clips located at the top and at the bottom of each module must be in the disengaged position as the module is
smoothly inserted into the slot. Once the clips have cleared the raised edge of the chassis, engage the clips simultaneously.
When the clips have locked into position, the module will be fully inserted.
CPU connections must be individually disconnected from the module before the module can be removed from the
chassis.
The new CT/VT modules can only be used with new CPUs; similarly, old CT/VT modules can only be used with old
CPUs. In the event that there is a mismatch between the CPU and CT/VT module, the relay does not function and
a
DSP ERROR or HARDWARE MISMATCH error displays.
NOTENOTE

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE C60 and is the answer not in the manual?

GE C60 Specifications

General IconGeneral
BrandGE
ModelC60
CategoryRelays
LanguageEnglish

Related product manuals