EasyManuals Logo

GE P442 User Manual

GE P442
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #299 background imageLoading...
Page #299 background image
Application Notes
P44x/EN AP/Hb
6
MiCOM P40 Agile P442, P444
(AP) 5-
147
5.9.5 DDBs from Check Synchronism function used in the PSL
The following DDBs are associated with the the check synchronization logic in the PSL (see
P44x/EN PL).
Logic inputs used by the check synchronism logic:
MCB/VTS Synchro,
MCB/VTS Main,
are managed dynamically (regarding where the main VT are located:bus side or line side
then the Csync ref is assigned to the other VT which is managed as the Csync ref)
Logic DDB outputs issued by the check sync logic
Check Sync OK [Used with AR close in the relevant PSL "AND" gate: [(AR
Close) & (CheckSync OK)]
A/R Force Sync,
V<Dead Line
V>Live Line
V<Dead Bus
V>Live Bus
Control No C/S
Ext Chk Synch OK
WARNING: TO ENSURE THAT THE AUTORECLOSE COMMAND IS CONTROLLED
BY THE CHECK SYNCHRONISM CONDITIONS, THE ABOVE PSL
SHOULD BE SET.
(Different schemes can be created with internal AR & external CSync or internal Csync &
external AR)
Figure 106: Check sync psl logic

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE P442 and is the answer not in the manual?

GE P442 Specifications

General IconGeneral
BrandGE
ModelP442
CategoryProtection Device
LanguageEnglish

Related product manuals