GE Energy Connections
Grid Solutions
MiCOM P40 Agile
P747
Technical Manual
Busbar Protection IED
Hardware version: A
Software version: 2
Publication reference: P747-TM-EN-1.1

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the GE MiCOM P747 Agile and is the answer not in the manual?

GE MiCOM P747 Agile Specifications

General IconGeneral
BrandGE
ModelMiCOM P747 Agile
CategoryProtection Device
LanguageEnglish

Summary

Chapter 1 Introduction

Features and Functions

Details the protection, control, and measurement functions of the MiCOM P747.

Chapter 2 Safety Information

Health and Safety

Provides essential information for personnel working with the equipment, covering hazards and qualifications.

Installation, Commissioning and Servicing

Covers critical procedures for safe installation, commissioning, and servicing of the device.

Chapter 3 Hardware Design

Chapter 4 Configuration

Using the HMI Panel

Explains how to navigate and use the device's Human Machine Interface for configuration.

Configuring the Data Protocols

Details the configuration steps for various communication protocols like Courier, DNP3, and IEC 61850.

Chapter 5 Protection Functions

Busbar Protection

Explains the principles of busbar protection and the current differential protection method.

Busbar Multiple Tripping Criteria

Details the criteria required for a correct tripping decision in busbar protection schemes.

Circuit Breaker Fail Protection

Describes the implementation, logic, and settings for Circuit Breaker Fail protection.

Backup Overcurrent Protection

Explains the functionality and settings for the backup overcurrent protection stages.

Configuring the Busbar Protection

Provides an example of configuring the busbar protection based on topology and CT connections.

Chapter 6 Monitoring and Control

Disturbance Recorder

Explains the operation, configuration, and extraction of disturbance records.

Trip Circuit Supervision

Describes the schemes and PSL logic for supervising the trip circuit.

Chapter 7 SCADA Communications

Chapter 8 Redundant Ethernet

Redundancy Protocols

Describes available redundancy protocols: PRP, RSTP, SHP, and DHP.

Configuring IP Addresses

Details how to configure IP addresses for the IED and redundant Ethernet board.

Chapter 9 Cyber-Security

Cyber-Security Implementation

Describes the cyber-security measures implemented at IED and external levels.

Cyber-Security Settings

Details the general and specific settings for implementing cyber-security measures.

Chapter 10 Settings Application Software

Send Settings to a Device

Describes how to transfer configuration settings from a file to the IED.

Chapter 11 Busbar Commissioning Tool

P747 Busbar Commissioning Tool (Remote HMI)

Overview of the tool for busbar commissioning, including scheme editor and monitor.

Chapter 12 Scheme Logic

Programmable Scheme Logic

Details tables and logic diagrams for programmable scheme logic, viewable in the PSL Editor.

Chapter 13 Installation

Chapter 14 Commissioning Instructions

Product Checks

Covers checks for the device de-energised and energised states.

Setting Checks

Ensures application-specific settings are correctly applied via HMI or files.

Busbar Protection Checks

Details specific tests for the busbar differential protection function.

Chapter 15 Maintenance and Troubleshooting

Maintenance

Covers regular checks, alarms, opto-isolators, output relays, and measurement accuracy.

Replacing the Device

Provides procedures for replacing the complete device or faulty PCBs.

Repairing the Device

Details steps for repairing the device, including PCB and component replacement.

Troubleshooting

Guides on identifying and resolving common hardware and software problems.

Chapter 16 Technical Specifications

Busbar Protection Functions

Provides accuracy specifications for busbar protection functions.

Appendix B Commissioning Record

Test Record

Provides a template for recording commissioning test details and results.

Tests with Product De-energised

Checks performed on the IED before applying power, including visual inspection and wiring.

Tests with Product Energised

Tests conducted after applying power, covering LEDs, watchdog contacts, and local settings.

Overcurrent Checks

Tests the overcurrent protection functions and their operating times.

Final Checks

Confirms that all tests are complete, settings are correct, and the device is ready for service.

Appendix C Wiring Diagrams

P747: Busbar Protection

Wiring diagram for the P747 busbar protection function (3 box solution).