1.8 VOLTAGE INPUT TESTS
Voltage Inputs (if applicable) Result (mark where appropriate)
Displayed voltage Primary / Secondary
Main VT ratio (if applicable)
Input VT Applied Value Displayed value
VZ1
VZ2
VZ3
VZ4
1.9 OVERCURRENT CHECKS
Overcurrent Checks Result
Overcurrent type Directional / Non-directional
Applied voltage V
Applied current A
Expected operating time s
Measured operating time s
1.10 ON-LOAD CHECKS
On-load checks Result
Test wiring removed? Yes / No
Voltage inputs and phase rotation OK? Yes / No
Current inputs and polarities OK? Yes / No
On-load test performed? Yes / No
(If No, give reason why) …
IED is correctly directionalised? Yes / No / N/A
1.11 FINAL CHECKS
Final Checks Result
All test equipment, leads, shorts and test blocks removed safely? Yes / No
Ethernet connected? Yes / No / N/A
Disturbed customer wiring rechecked? Yes / No / N/A
All commissioning tests disabled? Yes / No
Circuit breaker operations counter reset? Yes / No / N/A
Current counters reset? Yes / No / N/A
Event records reset? Yes / No
Fault records reset? Yes / No
Disturbance records reset? Yes / No
Alarms reset? Yes / No
MiCOM P747 Appendix B - Commissioning Record
P747-TM-EN-1 427
P747-TM-EN-1.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE MiCOM P747 Agile and is the answer not in the manual?

GE MiCOM P747 Agile Specifications

General IconGeneral
BrandGE
ModelMiCOM P747 Agile
CategoryProtection Device
LanguageEnglish

Related product manuals