EasyManua.ls Logo

GE Profile PGCS1RKZ

GE Profile PGCS1RKZ
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 63 –
Heater Troubleshooting
AC Heaters Resistance
Air Duct Heater *** 578
Defrost Heater * (See
Defrost Heater.) 31
Double Drawer Mullion Heater * (See
Double Drawer Mullion Assembly.) 827
Duct Port Heater *** 1200
Freezer/Fresh Food Mullion Heater *** (See
Fresh Food/Freezer Mullion Heater.) 1653
Return Duct Heater LH *** (See
Return Duct Heaters.) 440
Return Duct Heater RH *** (See
Return Duct Heaters.) 440
Supply Duct Heater *** 1653
* Replaceable individual heater
** Replaced as door assembly
*** Not replaceable
Note:
Air Duct and Supply Duct heaters will come on with abnormally high door open time and high humidity.
(Abnormal = approximately 70 fresh food door openings for 12 seconds or more in a 16 hour period.)
Duct Door heater, Door Gasket heater, and Recess heater are on 100% of the time when the freezer set
temperature is 4°F or lower. Above 4°F heater on-time will vary.
Duct Port heater is located around ice compartment port holes, and cycles on temperatures and ice
compartment conditions. (Mid-settings = heater on time approximately 30%)
Fill Tube heater will be on after water valve activation or when ice is dispensed.
DC Heaters Resistance (Approximate)
Door Gasket Heater ** 62
Duct Door Heater * (See
Dispenser and Interface.) 109
Fill Tube Heater ** 300
French Door Vertical Mullion Heater * (See
Articulating Door Mullion.) 24
Recess Heater ** 145

Related product manuals