Operating Instructions
4 VeriDri™ User’s Manual
3 Inserting the Transmitter into the System
Complete the steps below to install the VeriDri:
1. Make sure the sintered or sheet stainless-steel shield is in place. The
shield protects the aluminum oxide sensor from damaging elements
in the process.
2. The probe is mounted into the process via the 3/4-16 straight male
thread located on the probe. Thread the probe end of the transmitter
into the process/sample system fitting, making sure not to cross
thread it.
CAUTION! If you are mounting the VeriDri directly into the
process line, you must consult GE for proper installation
instructions and precautions before beginning the following
procedure.