EasyManua.ls Logo

Gehl RS6-34 - Page 108

Gehl RS6-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler TRANSMISSION
PRINTED IN U.S.A. 501-12 913241
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
Alt
=
to
hide
template
information
Alt+ to display template information
STEP 56
G0905128
Remove the lifting chains, hoist and lower and
remove the floor jack and blocking from under the
housing bell.
G0705071
NOTE:
The flywheel must be rotated to install the
flywheel-to-flex plate bolts. Rotate the flywheel by
inserting a pry bar through the inspection hole in the
bottom of the housing bell and into the ring gear.
STEP 57
G0705070
Rotate the flywheel until the bolt hole in the flywheel
is at approximately 6 o’clock and aligned with the nut
plate on the plate flex.
STEP 58
G0705024
Install the flywheel to plate flex bolt.
NOTE:
Do not fully tighten any of the flyweel-to-flex
plate bolts until all eight bolts are installed.
STEP 59
Repeat Steps 56 and 57 until all eight bolts are
installed. Torque the bolts to 35 to 40 lb.-ft. (48 to 54
Nm).
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Other manuals for Gehl RS6-34

Related product manuals