GEMAŞ Genel Mühendislik Mekanik San.ve Tic.A.Ş.
İTOB Organize Sanayi Bölgesi 10001 Sok.No:28 Menderes/İZMİR TURKEY
Tel:0232 799 0 333 Fax:0232 799 0 330 www.gemas.com.tr info@gemas.com.tr
11
ENG GEMAŞ STEAM GENERATOR AND CONTROL PANEL INSTRUCTIONS MANUAL V2.1
Boiler and Electrode Cleaning Range Table According to Water Hardness
Water Hardness
Expression
Hour
Very Soft Water
4320 hours or
Soft Water
3240 hours or
Medium Hard Water
2160 hours or
Hard Water
1080 hours or
Very Hard Water
360 hours or
MAINTENANCE
Boiler cleaning is a process that must be done according to the generator's working
time and feed water characteristics as mentioned above.
Maintenance, on the other hand, involves cleaning, as well as operations such as
control and part replacement by adhering to a certain schedule. Periodic maintenance
operations that must be done at certain time intervals are given in a table below. In
order to avoid any risk of safety and to use your generator for years without any
problems, make sure to apply the procedures written in the periodic maintenance
schedule on time.
CALENDAR
TRANSACTIONS
TRANSACTION DESCRIPTION
Monthly
Boiler and electrode
cleaning
Consider water hardness and working
hours.
Every 3
Months
In addition to the transactions to be carried out every month,
the following transactions:
Collector and Relief Valve
Cleaning
If lime has accumulated in the collector
and discharge valve inlets and outlets,
clean
Steam Outlet Connection
Cleaning
Unscrew the connection fitting on the
steam outlet, remove lime residue.
Water and Vapor Leakage
Control
Check the solenoid valves, boiler,
collector, steam outlet manifold and
steam outlet connections for leaks.
Every 6
months
In addition to the transactions to be performed every month and
every 3 months, the following transactions
Electrode Control
Check the length of the electrodes. If the
electrodes are 8 cm or less, replace the
electrodes with new ones.
Water Inlet Valve Cleaning
and Control
Clean the filter at the valve inlet, replace
if the valve is missing.
Every year
In addition to the Transactions to be Made Every Month, 3 and 6
Months, the Following Transactions
O - Ring Exchange
Replace the O-rings on the boiler,
electrode, collector, steam outlet
manifold, relief valve, adapter.
Leakage Current Relay
Control
Test the leakage current relay
Electrical Ports Control
Check fuse, contactor, terminal blocks
and other electrical connections.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gemas 18211 and is the answer not in the manual?

Gemas 18211 Specifications

General IconGeneral
BrandGemas
Model18211
CategoryKitchen Appliances
LanguageEnglish