Operator's Manual
First Edition • First Printing
Part No. 133136 GRC-12 25
Inspections
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to use.
4 Inspect the workplace.
Know and understand the workplace
inspection before going on to the next
section.
5 Only use the machine as it was intended.
Fundamentals
The workplace inspection helps the operator
determine if the workplace is suitable for safe
machine operation. It should be performed by the
operator prior to moving the machine to the
workplace.
It is the operator's responsibility to read and
remember the workplace hazards, then watch for
and avoid them while moving, setting up and
operating the machine.
Workplace Inspection
Be aware of and avoid the following hazardous
situations:
drop-offs or holes
bumps, floor obstructions or debris
sloped surfaces
unstable or slippery surfaces
overhead obstructions and high voltage
conductors
hazardous locations
inadequate surface support to withstand all load
forces imposed by the machine
wind and weather conditions
the presence of unauthorized personnel
other possible unsafe conditions

Other manuals for Genie GRC-12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie GRC-12 and is the answer not in the manual?

Genie GRC-12 Specifications

General IconGeneral
BrandGenie
ModelGRC-12
CategoryLifting Systems
LanguageEnglish

Related product manuals