EasyManuals Logo

Glow-worm Easicom 24 Installation And Servicing

Glow-worm Easicom 24
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
0020145065_01 - 09/12 - Glow-worm
11 Commissioning
i
IMPORTANT:
At the time of commissioning, complete all relevant
sections of the Benchmark Checklist located in the centre
pages of this document.
The commissioning should be carried out by a competent person
approved at the time by the Health and Safety Executive and in
accordance with the current issue of BS6798.
11.1 Switchingon
• Do not operate the boiler without water.
• Make sure that the system has been thoroughly ushed out with
cold water and that all cleanser if used has been removed.
• With the gas service isolation valve closed, with no demand
from any external controls and the power supply to the boiler
switched o.
• Test for gas tightness and purge air from the gas supply.
• Switch on the power supply to the appliance.
• Make sure that the domestic hot water and heating functions
on your appliance are not activated.
11.2 Filling the CH system (Central heating)
• Make sure that the installation's cold water inlet isolating valve is
open.
• Open the isolating valves located on the connections: they must
be positioned in the direction of the ow.
3
2
1
Key
1 Air vent
2 Pump
3 Screwforthepumpshaft
• Open the plug on the air vent located on the pump and
automatic air vents on the installation.
If the (CH.) pressure falls below 0.4 bar, the display will ash the
current pressure and the boiler will not operate. To increase the
pressure, the CH circuit requires " Topping up".
i
IMPORTANT:
When turning the 230Vac supply on to the boiler should
the water pressure be less than 0.5 bar an automatic air
vent function will be activated for a period of 5 minutes.
During this time the pressure should be increased and
air vented from the system. Note that the burner will not
re in either the CH or DHW mode and the display will
blink displaying the current water pressure.
• Vent air from each radiator until the water ows normally, then
close the vents.
• Leave the pump's air vent open.
i
IMPORTANT:
The following two operations will unblock the pump's
engine after a prolonged storage period and will purge
the air from the pumps circuit.
• Remove the screw from the pump shaft and introduce a at
screwdriver. A trickle of water, under no pressure should
normally come out of the pump.
• Rotate the pump's shaft through several turns, then replace
the screw.
11.3 Filling DHW Circuit
• Open the various hot water taps to ll the DHW circuit.
11.4 Filling the Condensate Trap
C
B
A
1
1
2
Key
1 Filling trap
2 Condensate trap
• Fill the trap with water (1).
• Activate the Heating and Domestic Hot Water functions.
INSTALLATION
- 21 -

Table of Contents

Other manuals for Glow-worm Easicom 24

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm Easicom 24 and is the answer not in the manual?

Glow-worm Easicom 24 Specifications

General IconGeneral
TypeCombi Boiler
Output24 kW
Fuel TypeNatural Gas
MountingWall Mounted
Domestic Hot Water Output24 kW
Max Working Pressure3 bar
Warranty2 years
Dimensions740mm x 418mm x 300mm
Efficiency RatingA
Flow Rate10 l/min
Hot Water Flow Rate10 l/min at 35°C rise

Related product manuals