EasyManua.ls Logo

Grant Solar GS222020X - Page 10

Default Icon
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
1. Select necessary
program/hydraulics
(s. „D.2. - Hydraulic
variants / systems“ on
page 13)
2. Strip cables by
55mmmax., insert,  t
the strain relief devices,
strip the last 8-9mm of
the wires (Fig. „C.2.3.“)
3. Open the terminals
using a suitable
screwdriver (Fig.
„C.2.4.“) and make
electrical connections
on the controller
4. Re t terminal
connection cover and
fasten screw.
5. Switch on mains voltage
and place controller in
operation.
C.2.3.
C.2.4.
Installation
Instructions for clamps:
1. Insert screw driver into the upper
hole. Push the lock clamp inside
down.
Keep the screw driver in this position.
2. Insert cable into the lower opening.
3. Remove screw driver. The clamp will
lock the cable.

Table of Contents

Related product manuals