EasyManua.ls Logo

Grant Aerona User Manual

Grant Aerona
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
UK | DOC 0203 | Rev 1.0 | February 2024
Grant Aerona
Smart Heat Pump System Controller
Installation & Operation Instructions

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Grant Aerona and is the answer not in the manual?

Grant Aerona Specifications

General IconGeneral
BrandGrant
ModelAerona
CategoryController
LanguageEnglish

Summary

Introduction to Grant Aerona Smart Controller

Safety Information for Installation and Use

Essential safety requirements for installation, including qualified installers and electrical safety precautions.

Technical Data for Grant Aerona Smart Controller

Wiring Centre Technical Specifications

Technical specifications and dimensions for the Grant Aerona Smart Controller wiring centre.

Touchscreen Display Technical Specifications

Technical specifications and dimensions for the Grant Aerona Smart Controller touchscreen display.

Installation Guide for Grant Aerona Smart Controller

Touchscreen Display Mounting Guidelines

Guidance on mounting the touchscreen display, including location and height recommendations.

Fitting the Touchscreen Display Unit

Step-by-step instructions for attaching the touchscreen display mounting plate and connecting the cable.

Wiring Centre Location and Fitting Instructions

Guidelines for selecting a suitable location and fitting the wiring centre.

Securing the Wiring Centre Unit

Detailed steps for mounting the wiring centre securely onto a flat surface.

System Hydraulics for Grant Aerona Smart Controller

Hydraulic Connections for Installation Pack P

Detailed hydraulic schematic diagram for Installation Pack P, showing component connections.

Hydraulic Connections for Installation Pack Q

Detailed hydraulic schematic diagram for Installation Pack Q, illustrating component connections.

Hydraulic Connections for Installation Pack R

Detailed hydraulic schematic diagram for Installation Pack R, showing component connections.

Electrical Connections for Grant Aerona Smart Controller

Connecting the Wiring Centre Power Supply

Instructions for powering the wiring centre, including fuse, earth, cable size, and RCD requirements.

Making Electrical Connections to Terminals

Guidance on making wiring connections using pluggable terminal blocks supplied with the accessory pack.

Connecting System Components to Wiring Centre

How electrical components are connected to the wiring centre, referencing layout and component terminals.

Wiring Centre Terminal Layout Diagram

Diagram and table detailing the layout and terminal connections within the wiring centre.

Electrical Connections for Installation Pack P

Wiring diagram illustrating electrical connections for Installation Pack P with the Smart Controller.

Electrical Connections for Installation Pack Q

Wiring diagram illustrating electrical connections for Installation Pack Q with the Smart Controller.

Electrical Connections for Installation Pack R

Wiring diagram illustrating electrical connections for Installation Pack R with the Smart Controller.

System Configuration with Touchscreen Display

Initial Controller Setup: First Switch-On

Initial setup steps including language, date, and time configuration before starting system setup.

Using the System Configuration Creator

Guide to using the creator for setting up space heating and DHW systems based on connected components.

Weather Compensation Setup

Enabling weather compensation using an outdoor sensor for automatic heating control adjustments.

Adjusting the Heating Curve

Configuration of the heating curve to adjust water temperature based on outdoor ambient temperature.

Heating Curve Adjustment Guidelines

Guidelines and methods for adjusting the heating curve for optimal comfort and economy.

Circuit Control Settings Overview

Options for controlling individual heating circuits, including fixed or weather-compensated methods.

Touchscreen Display Operation and Settings

Touchscreen Display Interface Overview

Overview of the touchscreen interface, its capacitive nature, and parameter editing via touch.

Smart Controller Operation Modes

How the controller manages the heat pump for DHW and space heating demands.

Managing the Main Heat Source Operation

Controller's role in managing heat pump operation based on DHW or space heating circuit demands.

Managing Heat Circuits Operation

Managing operation of up to three heat circuits, including fixed or weather-based temperature settings.

Managing Domestic Hot Water (DHW) Operation

Managing DHW cylinder heating and programming time intervals for operation and disinfection.

Accessing and Editing Circuit Settings

Accessing and editing settings for DHW or heating circuits displayed on the touchscreen.

Heat Circuit Settings Options

Options available for users to edit within the heat circuit settings panel.

Legionella Protection Functionality

Functionality to provide protection against legionella by scheduled temperature increases.

Enabling DHW Heater Support for Disinfection

Enabling DHW heater support in system settings to make disinfection available.

Configuring Legionella Protection Settings

Steps to configure Legionella protection settings, including day, start hour, and preset temperature.

Legionella Disinfection Scheduling

Scheduling Legionella disinfection to occur at specific times to avoid heating loss.

Programmable Time Schedules

Setting programmable time schedules for heating circuits, DHW, and the heat pump.

Circuit Control Functionality

Controlling the 3 available heating circuits via terminals in the wiring centre.

Thermostatic Pump Blockade Control

Controlling circuit pump/valve based on thermostat monitoring or forcing it active.

Enabling Thermostatic Pump Blockade

Steps to enable the Thermostatic Pump Blockade feature for a specific circuit.

Circuit Stop from Preset Temperature Control

Controlling a circuit based on water temperature sensor readings, stopping pump/valve when target temp is met.

Enabling Circuit Stop from Preset Temp

Steps to enable the Circuit Stop from Preset Temp feature for a circuit.

Stored System Settings Management

Storing and recalling default system configurations and settings within the controller's memory.

Saving System Settings as Default

Instructions to save the current system settings as a default configuration.

Restoring System Default Settings

Instructions to restore the previously saved system default settings.

Service Settings for Installers

Installation Control Menu Options

Accessing top-level menus for installation control, system configuration, and alarm lists.

Manual Control of System Components

Enabling manual control of heating system components for testing and operation.

Main Heat Source Settings

Settings related to the heat pump, including DHW and circuit temperature corrections.

Heat Pump Parameters for Installers

Heat Pump Set Points Configuration

Settings for weather compensation, maximum target flow temperature, and heat pump activation hysteresis.

Domestic Hot Water (DHW) Parameters

Parameters for DHW demand, including production type, max run time, and min heating time.

Wi-Fi Hub for Grant Aerona Smart Controller

Servicing the Grant Aerona Smart Controller

Health and Safety Information

General Health and Safety Information

Health and safety information specific to the Grant Aerona smart controller and references for heat pump.

Manufacturer's Guarantee for Aerona Smart Controller

Appendix D: Smart Immersion Relay

Legionella Protection Scheduling

Scheduling weekly DHW cylinder heating to 60°C for legionella protection.

Related product manuals