EasyManua.ls Logo

Grant Vortex 50/90 - Page 13

Grant Vortex 50/90
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Grant Vortex External Module
4 - GENERAL BOILER INFORMATION
4.4.6 Two pipe oil supplies
Riello RDB burner - See Fig. 6
1 The fuel pump is supplied for use with a single
pipe fuel supply system. For use on a two pipe
system, it is necessary to fit the By-pass screw (see
Fig. 6) into the tapping in the return port.
2 The By-pass screw is supplied in the boiler
accessory pack.
3 Remove the plastic burner cover (two screws).
4 Remove and discard the blanking plug from the
return connection of the pump and fit the By-pass
screw using an hexagonal key.
5 Connect the return oil flexible fuel hose to the pump.
6 Connect the
3
/
8
" to
1
/
4
" BSP adaptor to the flexible
fuel hose.
Fig. 4 - De-aeration device system
Fig. 5 - Tiger loop 'de-aeration' device
Fig. 6 - Riello RDB pump
1 Oil inlet connection
2 Return connection
3 By-pass screw
4 Pressure gauge connection
5 Pressure adjuster
6 Vacuum gauge connection
7 Solenoid
8 Supply to nozzle
1
2
3
4
5
6
7
8
1/4" BSP female
connections
Tiger Loop
SUPPLY
TO PUMP
RETURN
FROM PUMP
SUPPLY
FROM TANK
Fire valve
Tankmaster
See
section 4.4.6
Sludge
valve
Fill
pipe
Vent
pipe
Fuel
storage
tank
De-aeration device
e.g. Tiger Loop
See Fig. 5
Fire
valve
sensor
Supply
1m
Return

Related product manuals