EasyManua.ls Logo

Gree GMV-PD140W/NAB-K

Gree GMV-PD140W/NAB-K
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
119
DC Inverter Multi
VRF Service Manual
5. Fix the new
compressor to chassis
Use spanner to remove the
EROWV¿[LQJWKHFRPSUHVVRU
Ɣ5HSODFHWKHFRPSUHVVRU
DQGWLJKWHQWKHQXWV¿[LQJ
onto the base seat.
6. Connect the suction and
exhaust pipe of compressor
to system pipeline
Replace and lock
the compressor.
Then, connect
the pipe properly.
Ɣ:HOGWKHFRQQHFWLRQSLSH
of compressor and connect
it to the compressor
Note: During welding, take care not
WROHWWKHÀDPHEXUQRWKHUHOHPHQWV
7. Connect the power cables
of compressor correctly
Mark the power
cable colors and
corresponding
terminal codes
during removal.
Ɣ8VHVFUHZGULYHUWRWLJKWHQWKH
VFUHZV¿[LQJWKHSRZHUFDEOH
Ɣ&RQQHFWWKHSRZHUFDEOHFRUUHFWO\
Note: When connecting the power
cable, please take care on the
marking of power cable color and
corresponding terminal code.
8. Check and open
the cover plate
Ɣ&KHFNLIWKHSLSHLV
connected properly;
Ɣ&KHFNLIWKHSLSHLV
connected properly;
Ɣ,IQRSUREOHPFORVHWKHIURQW
and back cover plate.

Table of Contents

Other manuals for Gree GMV-PD140W/NAB-K

Related product manuals