EasyManua.ls Logo

Gree GMV-PD140W/NAB-K

Gree GMV-PD140W/NAB-K
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56
DC Inverter Multi
VRF Service Manual
DPOUSPM
9.3 Detection Control Board Interface Sketch is shown in Fig.2:
Fig2: Detection Control Board Interface Sketch
The gate-control function can be realized after the detective interface of detection control board connects
with interface of gate-control card and signal interface of it connects with the mainboard.
9.4 Products Parameters
Model: MK03 gate controller
Working Voltage: AC 220-240V, 50HZ or DC +5V-+24V
Power: 1W
Working temperature: -10~48
9.5 Installation of Detection Control Board
Fig. 3 Installation Sketch of Detection Control Board
No. 1 2 3 4
Description
Base box of socket installed
in the wall , a hole with
( L×W×D)100mm×100mm×50mm
Bottom plate
of detection
control board
Front panel
of detection
control board
Screw M4X25
Note: Detection control board with (L×W×H) 73.5mm×73.5mm×33.0mm

Table of Contents

Other manuals for Gree GMV-PD140W/NAB-K

Related product manuals