EasyManua.ls Logo

Gree GMV-PD140W/NAB-K

Gree GMV-PD140W/NAB-K
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
57
DC Inverter Multi
VRF Service Manual
DPOUSPM
Fig.3 is about installation process of detection control board. The following items should be attended.
1. Installation must be performed by professionals. Either 220-240V or DC 5-24V is ok.
2. Cut off the power of heavy current wire covered in the mounting hole in the wall before installation.
Never perform the installation with electricity.
3. Press the bottom plate of the detection control board on the wall, and then make it and front panel of
detection control board together.
$WODVW¿[WKHERWWRPSODWHDQGIURQWSDQHORIGHWHFWLRQFRQWUROERDUGWRJHWKHUZLWKVFUHZ67;
7KHUHVKRXOGQ¶WEHDQ\ODUJHSRZHUHOHFWULFDSSOLDQFHDQG¿UPLQJEDVHQHDUE\WRDYRLGLQWHUIHUHQFH
source.
6. Avoid sunlight and rain and do not install it at wet space.
7. Do not install the unit at the place where there is corrosive gas, serious dust, salt fog and oil smoke or
which is specially wet.
7KHGHWHFWLRQFRQWUROERDUGPXVWEHLQVWDOOHGDWFRQFHDOHGSODFHDQGIDUIURPZDWHUDQG¿UH

Table of Contents

Other manuals for Gree GMV-PD140W/NAB-K

Related product manuals