Ultra Heat GMV Multi VRF_Heat Recovery Serial
61
Status:
Unit waiting for debugging
Refrigerant recovery operation of after-sales
SE operation setting of system
Limit setting for max. capacity/output
capacity
Heat pump function setting
Compulsory excursion of engineering code
of IDU
Inquiry of project code of IDU
Check quantity of IDU on line
Charge refrigerant automatically
Charge refrigerant manually
Cleaning reminding of filter
Debugging confirmation when starting up
the unit
Long-distance emergency stop
High temperature prevention when heating
Emergency stop of operation
Eliminate the long-distance shielding
command of IDU
Length modification of connection pipe of
ODU
Note: For detailed malfunction and maintenance, please refer to the engineering debugging and
after-sales maintenance manual.