EasyManua.ls Logo

Greenwood Unity CV2GIP - Page 12

Greenwood Unity CV2GIP
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Part 2a – Installation details
2.1 Installation Checklist – General (all Systems) Tick as appropriate
Has the system been installed in accordance with manufacturer’s
requirements?
Have relevant system installation clauses been followed as detailed
in Tables 1, 3, 5 and 7 as applicable?
Type of ductwork installed (e.g. rigid, semi-rigid)
If any deviation from Tables 1, 3, 5 and 7, these
should be detailed here.
Description of installed controls
(e.g. timer, central control, humidistat, PIR, etc)
Location of manual / override controls
Yes No
Yes No
2.2 Installation Engineer’s Details
Name
Company
Address Line 1
Address Line 2
Telephone Number
Post Code
Signature
Competent Person Scheme /
Registration Number (if applicable)
Date of Installation (completion)

Other manuals for Greenwood Unity CV2GIP

Related product manuals