12
Part 2a – Installation details
2.1 Installation Checklist – General (all Systems) Tick as appropriate
Has the system been installed in accordance with manufacturer’s
requirements?
Have relevant system installation clauses been followed as detailed
in Tables 1, 3, 5 and 7 as applicable?
Type of ductwork installed (e.g. rigid, semi-rigid)
If any deviation from Tables 1, 3, 5 and 7, these
should be detailed here.
Description of installed controls
(e.g. timer, central control, humidistat, PIR, etc)
Location of manual / override controls
Yes No
Yes No
2.2 Installation Engineer’s Details
Name
Company
Address Line 1
Address Line 2
Telephone Number
Post Code
Signature
Competent Person Scheme /
Registration Number (if applicable)
Date of Installation (completion)