Part 2b – Inspection of Installation This section should be completed before completing part 3.
2.3 Visual Inspections – General (all Systems) Tick as appropriate
mm
m
2
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Total installed equivalent area of background ventilators in dwelling?
Total floor area of dwelling?
Does the total installed equivalent ventilator area meet the requirements
given in T
ables 5.2a, 5.2b, or 5.2c in ADF?
Have all background ventilators been left in the open position?
Have the correct number and location of extract fans/terminals been installed
that satisfy Table 5.2a in ADF?
Is the installation complete with no obvious defects present?
Do all internal doors have sufficient undercut to allow air transfer between
rooms (i.e. 10 mm over and above final floor finish)?
Has all protection/packaging been removed (including from background
ventilators) such that system is fully functional?
For ducted systems, has the ductwork installation been installed in such
manner that air resistance and leakage is kept to a minimum?
Are the correct number and size of background ventilators provided that
satisfy ADF?
Has the entire system been installed such that there is sufficient access for
routine maintenance and repair/replacement of components?
Upon initial start up, was any abnormal sound or vibration experienced, or
unusual smells detected?