Growatt SPA 1000TL - 5.3.2 Installation of SPA Series; 5.4.1 Connection of Grid and EPS terminal

Growatt SPA 1000TL
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
11
NOTICE:
For battery with DC breaker no need external DC battery.
The current sensor direction can't be reversed, please follow the arrow direction. Refer
to 5.4.3&5.4.6.
There are 3 types of sensors, the default one is CT with cable, wireless CT and meter are
optional.
Pay attention of the communication max allowed distance of different sensor.
5.3.2 Installation of SPA Series
5.4 System Connection Mode
5.4.1 Connection of Grid and EPS terminal
Project the machine's probably size on the wall; the thickness of wall for SPA Series
must be not less than 60mm.
Make sure the drill position, use paper board(installation guide), put the paper board
cling to the wall, make sure the top edge of paper board is level As the chart 5.8a
below).
Mark four points at the wall via the hole of the paper board, then remove the paper
board.
Drill four  8 holes at the mark point, the depth is not less than 55mm.
Knock four explosion bolt into 8 holes As the chart 5.8b below).
Hang the energy storage machine on the four setscrewsAs the chart 5.8c below .
Lock the nut of setscrewAs the chart 5.8d below .
The whole installation has finished.
SPA has a Grid output terminal and EPS out terminal. Look down on the SPA from the
frontthe terminal on the left (AC grid) is grid outlet for connecting gridthe terminal
on the right is an emergency power outlet for connecting critical load.
Fig 5.9
a
b c
d
Fig 5.8