EasyManua.ls Logo

Grundfos alpha2l - Start-up and Venting Procedures; Pre-Start-up Checks; Venting the Pump Mechanism

Grundfos alpha2l
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
9. Start-up
Contents:
9.1 Before start-up
9.2 Venting the pump
9.3 Venting of heating systems.
9.1 Before start-up
Do not start the pump until the system has been filled with liquid and
vented. The required minimum inlet pressure must be available at the
pump inlet. See 3. Applications and 12. Technical data and installation
dimensions.
9.2 Venting the pump
Fig. 11 Venting the pump
The pump is self-venting. It need not be vented before start-up.
Air in the pump may cause noise. This noise ceases after a few minutes
running.
Quick venting of the pump can be obtained by setting the pump to
speed III for a short period, depending on system size and design.
When the pump has been vented, i.e. when the noise has ceased, set the
pump according to the recommendations. See 7. Setting the pump.
The system cannot be vented through the pump.
See 9.3 Venting of heating systems.
TM05 1931 4512
2
2
P
HA2
P
HA2
AL
AL
ALPHA2 L
I
II
III
POWER
ON
I
III
1
2
= 10 Min.
Caution
The pump must not run dry.

Related product manuals