EasyManua.ls Logo

Grundfos CR 95 - Order of Assembly for Chambers and Impellers

Grundfos CR 95
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.4 Order of assembly for chambers and impellers
The assembly of the pump is illustrated in the following drawings.
Each symbol corresponds to a different chamber.
7.4.1 Standard impellers
Pos. 49 is the standard size impeller.
7.4.2 Impellers with reduced diameter
Pos. 49a is an impeller with reduced diameter, 2/3 of standard size.
Impellers (49a) must be fitted as the last stages which are at the
upper part of the pump stack.
Pos. 49h is an impeller with reduced diameter and a larger front
shroud diameter. These impellers are only fitted in pumps which
also contain impellers (49a) with reduced diameter.
Impeller (49h) must be fitted as first stage of the pump which is
placed just above the inlet part (44). Impellers with pos. 49h can be
identified by having one of the below listed part numbers which is
engraved into the impeller:
99549699
99547569
99553557
99553558
99553559
99553560
TM068473
23
English (GB)

Other manuals for Grundfos CR 95

Related product manuals