EasyManua.ls Logo

Grundfos KJI K Series - Dry pit installation

Grundfos KJI K Series
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
K-Series
I/O Manual
Prepared by.
Rev. No. 0
Date. 11-Jan-11
Page. 12 / 25
5.4 Dry pit installation
In the Dry pit installation, the pump will be installed in a stationary position of
the dry well next to the wet sump.
The pump has a watertight motor therefore wouldn’t be damaged in the event
of flooding .
The pump is equipped with a cooling jacket.
In addition to, the following items are required:
- Plate and anchor bolts for anchoring the pump to a concrete base.
- Base stand and suction connection are integrated .
- Bolt the suction cover to the concrete base by means of four grouted-in
anchor bolts .
- Bolt the pump to the suction connection .
- Check that the pump is vertical .
- Connect the motor cable, suction line and discharge line .
Make sure that the weight of the pump does not bear on the system piping.
fig. 8

Related product manuals