9
that it cannot be accidentally switched on.
Connect the power (motor) cable from the pump with the power/motor cable of the converter.
converter has been switched off.
8. Start-up and operation
8.1 Start-up
Switch on the electricity supply when the pump has been installed and connected to the converter.
• Turn switch 1 to ON to start the converter
Thedisplayshows:StoP(seeg.8b)
• Turn switch 2 to FWD
Thedisplayshows:H00(seeg8c)
8.1.1 Speed control
• Turn switch 3 to in- or decrease the speed.
Thedisplayshowstheactualspeed(seeg.8dand8e)
The MP 1/Redi-Flo2 pump is not designed for continuous operation like for instance remedial pumping.
Continuous operation may reduce the life of the pump.
Mains supply
Power/motorcable
Fig. 9 Converter connections