Fig. 14 Incorrect foundation
Fig. 15 Base frame with pouring holes
It is important to prepare a good foundation prior to the
installation of the pump.
NB, NBG pumps with base frame are always prepared for
grouting (grouting anchors welded on to the base frame).
For 2-pole NB, NBG pumps with large motors, grouting of the
base frame is mandatory in order to prevent vibration energy from
the rotating motor and liquid flow to evolve. See table.
For pumps with motors up to and including 45 kW and for all
pumps with 4- and 6-pole motors, grouting is only to be seen as
an option.
Steps
There are three steps:
1. Pouring of foundation
2. Shimming of base frame
3. Grouting
1: Pouring of foundation
We recommend the following procedure to ensure a good
foundation.
TM03 4324 1206
TM03 4587 2206
kW
55
75
110
132
160
200