3. Delivery and handling
3.1 Delivery
The pumps are tested 100 % before leaving the
factory. The test includes a function test where the
pump performance is measured to ensure that the
pump meets the requirements of relevant standards.
Test certificates are available from Grundfos.
3.2 Handling
Weight: See label on the packing.
Pumps should be lifted by means of nylon straps and
shackles or a hook as shown on figs. 1 to 3.
Fig. 1 Correct lifting of pump without base
frame
Fig. 2 Correct lifting of pump with base frame
Fig. 3 Correct lifting of pump without motor
Fig. 4 Incorrect lifting of pump
Warning
Pump motors as from 4 kW are supplied
with lifting eyes which must not be used for
lifting the entire pump unit. See fig. 4.