Chapter 5: Enclosure Installation
8. Install the end toeboard (17) to the plank (11) and inner toeboard (32) using bolts (9) and nuts (33).
NOTE: Install the head of the bolts to the inside of the platform.
Figure 5-11 Catwalk toeboards
9
3/8 x 1 in. flange bolt (S-7485)
26
Ladder wall heat shield (see parts)
11
18, 24 and 30 ft. plank catwalk / platform
32
Inner toeboard - 12, 18, 24 and 30 ft outside
17 Platform end toeboard 33
3/8 in. flange nut LRG (S-968)
76
PNEG-2016 Tower Dryer Heat Reclaimer