Calibration
The instrument
cannot be calibrated by the user. Contact the
manufacturer for instrument calibration.
Maintenance
C A U T I O N
Personal injury hazard. Only qualified personnel should conduct the tasks
described in this section of the manual.
N O T I C E
Do not disassemble the instrument for maintenance. If the internal components
must be cleaned or repaired, contact the manufacturer.
Maintenance schedule
Table 9 shows the recommended schedule of maintenance tasks.
Facility requirements and operating conditions may increase the
frequency of some tasks.
Table 9 Maintenance schedule
Task 1 year
Replace the inlet tubing on page
23 X
Calibration on page 23 X
Replace the inlet tubing
Replace the air inlet tubing regularly to prevent organic growth or
inorganic particle contamination on the tube walls. Contamination can
result in false high particle counts.
The manufacturer recommends that the air inlet tubing of typical FMS
installations in life science and pharmaceutical manufacturing clean
rooms be replaced at least once a year.