EasyManua.ls Logo

Haier AU182AFBEA - Page 43

Haier AU182AFBEA
365 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
>a__WcU[S^ <[c >a`V[e[a`Wc
duct unit without auxiliary duct: duct unit with auxiliary duct:
Installation state: the unit should be placed on the flat floor or be mounted in horizontal direction.
Testing method:
standing-on-floor unit: If the unit cooling capacity is
over 28000W, the noise level should be measured at
the front, left, right directions respectively.
mounting-on-ceiling unit:
mounting-on-wall unit: built-in-ceiling unit:
1m
1m
1m
1m
0.8m
1m
1.4m
1.4m
2m
duct
auxiliary duct
2m
1.4m
1m
auxiliary duct
-43-

Table of Contents

Related product manuals