Installation instruction
(3) Transportation and hoisting
Hoisting
Handling
Please remove the outdoor unit to the installation location as far as possible near place befor
open the packaging.
Forbid on the equipments to place anything, need to use 2 ropes while promoting outdoor.
Please according to following way hoisting outdoor:
Ensure that the outdoor unit when hosting the level to rise slowly.
Do not remove the packaging.
When hoisting do not have to tie up the elevator to the unit hits on the packaging and the
outside wrapping.
When hoisting exterior must use the suitable protection.
Before the installation,outdoor do not deposit any material,otherwise likely has the re or the
accident.
When handling unit,please operate as shown in the following gure and note the following points
1.Forbids to demolish the wooden foundation.
2.Prevent the outdoor to incline.
3.Should be handling more than two.
handle 1
handle 2
handle 3
handle 4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Haier MRV5 and is the answer not in the manual?

Haier MRV5 Specifications

General IconGeneral
BrandHaier
ModelMRV5
CategoryAir Conditioner
LanguageEnglish

Related product manuals