Do you have a question about the Hardi EAGLE SPB BOOM and is the answer not in the manual?
Brand | Hardi |
---|---|
Model | EAGLE SPB BOOM |
Category | Paint Sprayer |
Language | English |
Introduction from the company welcoming the new owner and highlighting product quality and customer satisfaction.
Guidelines and warnings for safe operation of the sprayer, including symbol explanations.
Read and understand the manual, follow local laws, wear protective clothing, and practice safe handling.
Contact information for poison control centers and a space to list chemicals used.
Details the various HARDI EAGLE boom types and their sizes, including SPB and SPC models.
Describes the four hydraulic system versions (HY, HV, HZ trailed, HZ self-propelled) for the EAGLE booms.
Defines the terminology for SPB/SPC boom sections and Dual Fold SPC boom sections.
Explains the switches on the HV, HZ (Ranger 550), and HZ (Ranger 2000, Navigator) hydraulic control boxes.
Details the switches on the hydraulic control box for 90'/60' SPC Dual Fold booms (Navigator).
Details the switches on the hydraulic control box for 120'/90' SPC Dual Fold booms (Navigator).
Explains the SetBox controls for secondary functions on sprayers equipped with ISOBUS.
Details the HZ hydraulic controls on the Grip handle for ISOBUS and PRESIDIO systems.
Explains the boom controls on the HARDI Spray center in combination with Grip controls for PRESIDIO.
General information on hydraulic system setup, including ensuring clean snap couplers and checking oil levels.
Details connection requirements for SPB/SPC HY-model booms and required oil flow/pressure.
Details connection requirements for SPB HV-model booms and required oil flow/pressure.
Details connection requirements for SPB/SPC HZ-model booms and required oil flow/pressure.
Explains how to adjust the HZ hydraulic block for boom raise, lower, fold, and tilt functions.
Information on setting up open center hydraulics, including valve adjustments and load sensing.
Details adjustable suspension positions for 80'-100' SPC booms to achieve desired trapeze effect.
Critical safety warnings for boom folding/unfolding, driving near power lines, and general operation precautions.
Step-by-step instructions for unfolding, raising, lowering, and folding SPB booms with HY version (Ranger).
Instructions for unfolding, raising, lowering, and folding SPB/SPC booms with HY version (Navigator).
Detailed steps for unfolding, lifting, folding, and lowering SPB booms with HV version using control box.
Instructions for unfolding, tilting, lifting, and folding SPB booms with HZ version (Ranger 550).
Detailed steps for unfolding, tilting, lifting, and folding SPB booms with HZ version (Ranger 2000).
Instructions for unfolding, tilting, lifting, and folding SPB/SPC booms with HZ version (Navigator).
Step-by-step guide for unfolding and folding 90'/60' SPC Dual Fold booms, including width adjustments.
Instructions on how to operate the boom with only one side unfolded, including spray section control.
Detailed steps for unfolding and folding 120'/90' SPC Dual Fold booms, including width adjustments.
Instructions for unfolding and folding SPB booms using the Ranger with ISOBUS system and SetBox controls.
Guide for operating SPB, SPC, and 90'/60' Dual Fold SPC booms with Navigator and ISOBUS.
Instructions for operating 120'/90' Dual Fold SPC booms with Navigator and ISOBUS.
Step-by-step guide for unfolding and folding SPC booms using the PRESIDIO system.
Instructions for unfolding and folding 90'/60' Dual Fold SPC booms using the PRESIDIO system.
General guidelines for storing and applying lubricants, including pictogram explanations.
Lists recommended ball bearing grease, slide bearing grease, and oil lubricants for the machine.
Oiling plan detailing lubrication points for 120'/90' and 90'/60' Dual Fold SPC booms.
Details service intervals for In-Line filters, nozzle filters, spraying circuits, boom readjustment, and hydraulic circuits.
General information on occasional maintenance tasks that depend on operating conditions.
Troubleshooting common seal issues and instructions for disassembling and reassembling feed pipe snap-lock assemblies.
Instructions for removing feed pipe from clamps and initial fitting of fittings.
General checklist before boom adjustments, including lubrication, tractor connection, and unfolding.
Procedure to check and adjust the alignment of inner and outer wing sections for all boom types.
Instructions for checking and adjusting hydraulic stop valves on Dual Fold SPC booms.
Details on adjusting inner/outer wing alignment, including specific notes for SPB and SPC types.
Procedure for adjusting the front fold cable, crucial for spraying performance and outer section movement.
Details on adjusting breakaway sections to prevent boom damage upon impact.
Procedure to check and adjust sprocket timing on 45'-66' SPB booms.
Instructions for adjusting boom sections to be parallel to the center frame and level to the ground.
Procedure for adjusting the rear cable, ensuring proper boom folding and transport.
Instructions for adjusting center section cables to maintain correct center frame position during folding.
Details on inspecting and adjusting yaw rubber dampers for specific SPC and Dual Fold SPC boom models.
Instructions for inspecting and adjusting yaw rubber dampers for the 120'/90' Dual Fold SPC boom.
Procedure for adjusting yaw bolt to manage boom slack and prevent uncontrolled swinging.
Identifies common causes of operational problems, such as dirty hydraulics and battery issues.
Troubleshooting guide for hydraulic system issues like slow/erratic boom, non-functioning rams, and unresponsive functions.
Addresses mechanical problems such as boom not folding, not aligned, or not staying in position.
Lists filter gauze widths and nozzle specifications.
Provides operating temperature range for hydraulics and maximum operating pressure for the tractor.
Details plug positions for HZ hydraulics on standard, 120'/90' Dual Fold, and 90'/60' Dual Fold booms.
Hydraulic diagrams for HY systems on SPB Ranger and SPB/SPC Navigator models.
Hydraulic diagram for HZ systems on SPB Ranger models.
Hydraulic diagram for HZ systems on SPB & SPC Navigator models.
Hydraulic diagram for 90'/60' Dual Fold SPC booms on Navigator.
Hydraulic diagram for 120'/90' Dual Fold SPC booms on Navigator.
Hydraulic diagram for 75'-90' SPC booms on PRESIDIO.
Hydraulic diagram for 90'/60' Dual Fold SPC booms on PRESIDIO.
Wiring diagram and specifications for boom and work lights on trailed sprayers.
Details the limited warranty terms, conditions, exclusions, and responsibilities of the customer and manufacturer.
Covers extended warranty for pumps and tanks, manufacturer's rights, claim procedures, and liability disclaimers.