a) During this procedure, be especially careful not to place too much pressure on
the main tuning dial.
b) During this procedure, be especially careful not to place too much pressure on
the zero set shaft.
Gently slide the front panel over all of the control shafts, paying particular attention to the
Preselector and PA Tune shafts as they will tend to be pulled down by the rubber “O” rings.
When all of the front panel control are through to corresponding holes in the front panel, gently
slide the panel all the way on paying particular attention to the zero set shaft and main tuning
shaft
Loosely install the flat washer and nut on the Headphone Jack and AF Gain controls (this will
help hold the front panel in position).
Make sure the locating tab on the Band Switch is correctly located in the hole in the chassis.
Loosely install the flat washer and nut on the Band Switch.
Install the microphone connector with the two sockets located horizontally. Pin number 2 (the
PTT Line) should be positioned closest to the headphone jack
At this point, the flat washers and nuts can be installed on the remaining controls.
Install the bushings for the Preselector and PA tune shafts. Once the nuts are started, leave
them loose temporarily, install the sub-panel with the VOX controls and then tighten the nuts.
Install the two screws holding the front panel to the side supports
Reconnect the two black wires to pin 2 of the microphone jack and the 22k resistor to pin 1 of
the microphone jack
Reconnect the meter leads
Servicing Procedures Page 66