EasyManua.ls Logo

Heathkit SB-1000 - Page 50

Heathkit SB-1000
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page
52
gf
/
“§)
Hold
the
two
meters
in
place
while
you
raise
the
frontpanel
up
toward
the
frontsubpanelasshown
in
Detail
6-20B.
Then
use
two
long
rails,
two
short
tails,
and
eight
6-32
x
3/8”
screws
to
mount
the
front
panel
to
the
front
subpanel.
NOTE:
The
rails
may
be
mounted
either
way.
M1:
Similarly,
position
the
face
of
the
grid
current
meter
in
its
corresponding
cutout
in
the
front
panel.
Refer
to
Pictorial
6-21
while
you
perform
the
following
steps.
Inspect
each
meter
for
a
shorting
wire
that
may
be
connected
between
the
two
terminals.
Remove
any
shorting
wire
that
you
may
find.
Locate
the
free
end
of
the
orange
and
yellow
twisted
pair
coming
from
the
meter
circuit
board.
Then
refer
to
Detail
6-21A
and
connect
the
wires
at
the
free
end
of
this
pair
to
grid
current
meter
M1
as
follows:
()
Orange
wire
to
the
positive
(+)
marked
terminal
(S-1).
(/
Yellow
wire
to
the
negative
(-)
marked
terminal
(S-
“DD.
Similarly
refer
to
Detail
6-21A
and
connect
the
free
end
of
the
red
and
brown
twisted
pair
coming
from
the
meter
circuit
board
to
multimeter
M2
as
follows:
\£)
Red
wire
to
the
positive
(+)
marked
terminal
(S-1).
Y
Brown
wire
to
the
negative
(-)
marked
terminal
(S-
1).
Oe
Date
and
sign
the
FCC
label.
Then
remove
the
backing
paper
and
press
the
label
onto
the
outside
of
the
rear
panel
in
the
area
shown.
Carefully
peel
the
backing
paper
from
the
Danger
label.
Then
press
the
label
onto
the
top
of
power
transformer
T]
as
shown.
Heathkit
Refer
to
Pictorial
6-22
while
you
perform
the
following
steps.
t
e
»
Refer
to
Detail
6-22A
and
start
a
6-32
x
1/8"
setscrew
into
the
small
knob
and
two
6-32
x
3/16”
setscrews
into
each
of
the
large
knobs.
Be
sure
to
start
the
setscrews
into
the
indicated
holes
of
the
large
knobs.
()
Turn
the
shaft
of
the
Multimeter
switch
fully
counterclockwise.
Then
install
the
small
knob
on
the
shaft
of
the
switch
and
tighten
the
setscrew.
Be
sure
to
line
up
the
knob
pointer
with
the
line
at
“High
Voltage”
before
you
tighten
the
setscrew.
NOTE:
The
setscrew
in
the
knob
does
not
line
up
with
the
flat
on
the
shaft.
Remove
both
screws
from
the
flange
of
the
top
vernier
drive.
Discard
one
of
the
screws.
Make
sure
variable
capacitor
C27
is
fully
meshed
(closed).
Then
refer
to
Detail
6-22B
and
use
one
of
the
screws
that
you
removed
from
the
vernier
drive
and
a
#4
fiber
flat
washer
to
mount
the
dial
pointer
onto
the
drive
as
shown.
Make
sure
the
pointer
is
toward
the
left
end
of
the
scale
on
the
front
panel.
Also
make
sure
the
pointer
does
not
rub
against
the
panel.
Jb
Similarly
mount
a
dial
pointer
onto
the
bottom
vernier
drive.
Make
sure
variable
capacitor
C31
is
fully
meshed
and
the
pointer
is
toward
the
"0"
on
the
front
panel.
Also
make
sure
the
pointer
does
not
rub
against
the
panel.
Install
a
large
knob
onto
the
shaft
of
each
vernier
drive
and
tighten
the
setscrews.
Make
sure
the
knob
does
not
rub
against
the
dial
pointer.
Turn
the
shaft
of
the
Band
switch
fully
counter-
clockwise.
Then
install
a
large
knob
on
the
shaft
of
the
switch.
Make
sure
the
knob
pointer
lines
up
with
the
line
at
"160"
on
the
front
panel
before
you
tighten
the
setscrews.

Other manuals for Heathkit SB-1000

Related product manuals