EasyManua.ls Logo

Hercules Montfoort Cruise F7 Series - Break in Operation; Preparing a Break in Operation; Carrying out Break in Operation

Hercules Montfoort Cruise F7 Series
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
034-11471_1.1_11.10.2017
45
Transportation, storage and assembly
5.2.1 Break in operation
If the bicycle is to be removed from service for longer
than four weeks, e.g. in winter, a break in operation
has to be prepared.
5.2.1.1 Preparing a break in operation
Remove the battery from the bicycle.
Charge the battery to around 60% (three to four LEDs
of the charge status indicator light up).
The bicycle has to be cleaned with a damp cloth and
preserved with wax spray. Never wax the friction
surfaces of the brake.
Before longer periods without use, it is
recommendable for the HERCULES specialist dealer
to carry out servicing, basic cleaning and apply
preservative agent.
5.2.1.2 Carrying out break in operation
Store the bicycle, battery and charger in a dry and
clean environment.
Check the charge status of the battery after 8
weeks. If only one LED of the charge status
indicator lights up, recharge the battery to around
60%.
The battery discharges when it is not used. This can
cause damage to the battery.
The battery has to be recharged every 8 weeks.
The battery may become damaged if it is connected
permanently to the charger.
Do not connect the battery to the charger
permanently.
NOTICE
NOTICE
EN_034-11471_1.1_0.01_09.18_HERCULES BOSCH_Puria_Inhalt.book Page 45 Wednesday, October 11, 2017 1:59 PM

Table of Contents

Related product manuals